Para cada «¿qué pasaría si...?» que te plantees sobre el embalaje, tenemos una respuesta. jackzhao@briverglass.com
Built for stable mass production—supported by process control, inspection gates, and export-ready packing for global delivery.
Founded in 2016 · OEM Manufacturing · FOB Qingdao
Key Capacity Facts
2016
Exportado a más de 50 países
900
+Más de 900 empleados
80
+Más de 80 líneas de producción
1,100,000
1.100.000 botellas al día
100,000
㎡Instalación de 100.000 m²
50
+Exportado a más de 50 países
Facilities Overview
Our facilities are organized for repeatable production and stable delivery—from forming and annealing to inspection, decoration and pack-out.
Process Control Map
Paso 01
Batching
Paso 02
Melting
Paso 03
Forming
Paso 04
Annealing
Paso 05
Inspection
Paso 06
Decoration (if any)
Paso 07
Packing
Paso 08
Shipment
Quality Gates in Production
Incoming Inspection (IQC) for materials and components
In-process checks (shift routines and dimensional monitoring)
First-article approval for new items/changeovers
Final inspection (automatic inspection + dedicated tests)
Decoration QC before packing (if finishing is applied)
Testing Capability Snapshot
We verify key performance and consistency with dedicated tests. Typical checks include:
Thickness (wall/bottom)
Verticality / axial deviation
Internal stress
Impact resistance
Thermal shock
Sealing / pressure checks (as applicable)
Capacity & Lead Time Logic
Lead time is planned based on bottle type, decoration complexity and order volume. The schedule starts after deposit, final specification/artwork approval, and tooling confirmation (if required).
Factory:
Standard models: faster selection and production planning
Custom bottles: tooling + sampling + golden sample approval before production
Export Packing & Shipment (FOB Qingdao)
Export-ready packing standards help reduce transit damage risk. We confirm carton, partitions, palletization and markings before shipment and support repeat-order standardization.
Visit Us or Start Your Project
Share your bottle requirements and timeline. We will propose a workable production plan and quotation.